
Two checks before transport
A planned route and a fully lowered auger are two important checks before moving between work sites. Identify overhead power lines and choose a route that avoids them, then completely lower the portable auger before transport. If you’re unsure of a line’s height, contact the power company before starting the move.
Before the auger moves
1. Check the intended route for overhead lines. We recommend knowing where lines are on your farm and choosing an equipment route that avoids them. Make that choice before moving, not after reaching a line.
2. Check line height and clearance. We recommend maintaining 10 feet of clearance between equipment and overhead power lines. If a line’s height is uncertain, contact your power company to determine it before moving rather than guessing whether the auger will fit underneath.
3. Completely lower the auger. Penn State Extension’s Grain Auger Safety guide recommends fully lowering portable augers before transport to avoid contact with power lines.
Lowering does not replace the route check
As Penn State Extension explains, electricity can arc – jump through the air – from a power line to an auger without direct contact. A lowered auger still needs the clearance described above. Lowering the auger does not make a route close to overhead lines an acceptable choice.


